
Project Objective
To refurbish and extend the existing casino and hotel building by developing accurate models representing current conditions and integrating new design elements seamlessly into the existing structure.
Scope of Work
Develop a coordinated 3D model of the existing casino and hotel building.
Integrate new architectural, structural and MEP extensions.
Perform multidisciplinary clash detection and coordination.
Deliver a construction-ready BIM model.

- Existing building model
- All the available project data

The project involved upgrading and expanding an existing casino and hotel facility in New York. Our team first created an as-built model reflecting current site conditions. We then incorporated the new design extensions into the existing framework across architectural, structural and MEP disciplines. The dual requirement of remodelling while extending the structure posed its own challenges, but our team ensured precision, seamless coordination and high-quality execution. The client appreciated our detailed approach, efficient problem-solving methodology and the final construction-ready model delivered.
Our Client’s Challenges
- Simultaneous refurbishment and expansion of the facility.
- Need for accurate integration of new designs with existing conditions.
- Multidisciplinary coordination required to avoid clashes.
Our Approach and Solution
- Developed an accurate model of existing conditions as the foundation.
- Integrated new architectural, structural and MEP elements into the existing model.
- Conducted thorough interdisciplinary clash coordination to avoid construction conflicts.c
- Ensured smooth model progression, high accuracy and timely delivery.
- Comprehensive 3D BIM Models
- Coordinated Architectural, Structural & MEP Model ready for construction







